SeaVeyors completed dock inspection and repair work at Hot Springs Cove, combining underwater assessment with practical marine construction and installation.

Inspection through to completed repairs

Following the initial inspection, our team returned to complete the repairs, including work on dock pile guides, timber framing, contact strips, and associated hardware. SeaVeyors also fabricated and installed dock ladders.

Darren Horler provided marine project leadership, coordinating the personnel, equipment, and field work required to deliver the repairs at this remote coastal facility.

Subsequent engineering-led inspection

Approximately ten years after the original work, SeaVeyors was engaged as a subcontractor by an engineering firm to carry out the underwater portion of a further inspection at the same facility.

Completed repair photographs

Completed pile-guide framing and contact strips.
Completed pile-guide framing and contact strips.
Completed timber repairs along the dock edge.
Completed timber repairs along the dock edge.
Dock ladder fabricated and installed by SeaVeyors.
Dock ladder fabricated and installed by SeaVeyors.

The date shown above is the publication date of this case study, not the date the original repairs were completed.